Safety-Kleen Inc Dba Emerald Services Inc 1825 Alexander Ave, Tacoma, WA  98421 Proposal to increase production by 10 percent. 4/22/21 Alfredo Arroyo
National Sign Corporation  1541 S 92nd Pl, Seattle, WA 98108  The applicant is proposing to install a spray booth to be used for the manufacturing of signs. 4/22/21 Maggie Corbin 
ES Engineering Services, LLC 765 Rainer Avenue South, Renton, WA 98057 A soil remediation system with carbon adsorption for the control of emissions. 4/22/21 Alfredo Arroyo
Technical Glass Products 8107 Bracken Place SE, Snoqualmie WA 98065 Replacement of a dust collector.  4/22/21 Alfredo Arroyo
US Navy Naval Undersea Warfare Center 610 Dowell St, Keyport WA  98345 New thermal spray booth with integrated fabric filtered plenum. 4/22/21 Alfredo Arroyo
Mystic Sheets dba Graphic Sheets 301 SW 27th St, Renton, WA 98057 New corrugated line with existing dust collection system. 4/22/21 Alfredo Arroyo
Mystic Sheets dba Graphic Sheets 301 SW 27th St, Renton, WA 98057 Replacement of existing boiler system with a new larger boiler rated at 37.7 MMBtu. 4/22/21 Alfredo Arroyo
Seaboard Cabinet Co 5728 204th St SW, Lynnwood, WA  98036 Replacement of a dust collector. 4/22/21 Alfredo Arroyo
Seaport Midstream Partners LLC  1652 SW Lander St,  Seattle, WA 98134  Application submitted to remove the monthly reporting requirement of temperature for the vapor combustion unit. 4/22/21 Ralph Munoz
Southwest Suburban Sewer--Salmon Creek  12550 Shorewood Dr SW, Burien, WA 98146  Permit application submitted for addition of a second digester, changes in holder covers and the odor scrubber and replacement of existing digester gas boilers. 4/22/21 Ralph Munoz
James Hardie Building Products Inc  18200 50th Ave E, Tacoma, WA 98446  Temporary boiler installation 4/13/21 Brian Renninger
Visual Options  4520 S Adams St, Tacoma, WA 98409 Application for CO2 laser for cutting, engraving, and etching of various materials including steel, plastics, wood and paper. 4/5/21 Madeline McFerran